Connecting a current transformer correctly – step by step

Most installation mistakes come down to three things: wrong mounting direction, swapped secondary leads and an open secondary circuit. Primary terminals are marked P1 and P2 (older: K and L), secondary terminals S1 and S2 (older: k and l). Current flows from P1 to P2 in the conductor; the secondary current flows from S1 through the meter back to S2.

Current transformer wiring diagram: conductor from the supply side P1 to the load P2 through a 250/5 A current transformer, secondary terminals S1 and S2 with leads to the meter, earthing at one point, short-circuit bridge between S1 and S2
Connecting a current transformer: P1 faces the supply, S1 and S2 run to the meter, the secondary circuit is earthed at exactly one point and short-circuited via the bridge before disconnecting.
  1. Step 1: Mounting direction: P1 towards the supply

    Mount the CT so that P1 faces the supply and P2 the load; mount all phases the same way round. Energy meters count negatively if a CT is reversed.

  2. Step 2: S1 and S2 to the meter

    Two leads per CT go to the current path of the meter: S1 to the input, S2 to the output of the same phase. Lead length and cross-section determine the burden.

  3. Step 3: Earth at one point only

    If the secondary circuit is earthed, use exactly one terminal, the same on all CTs of the metering point – which one is set by the grid operator’s connection conditions or the design.

    • Step 4: Short-circuit before disconnecting

      Never operate the secondary circuit open while current flows in the conductor. Short-circuit S1 and S2 before removing the meter.

      Calculators and related pages

      Recommended Products

      FAQ

      Is k or l earthed?

      Exactly one secondary terminal is earthed, the same on all CTs of a metering point; which one is set by the grid operator’s connection conditions or the design.

      Which way round is the CT installed?

      P1 (K) towards the supply, P2 (L) towards the load.